Saturday, October 29, 2011

The Shed Project: Update on Last Week

So last weekend the goal was to get the plumbing and electric run... CHECK! Plus some: CHECK CHECK!

Here's everything that we got taken care of from the List:
  • Upgrade electric to handle stove, water heater, refrigerator, and other electronics other than the single light that was in there.
  • Run Plumbing - this is our nice, covered over ditch!
  • Framing in a bit for the bathroom - shower base installed, toilet installed, shower walls delivered, hot water heater ready to be placed.
  • Kitchen area along left hand wall - plumbing ready for the sink, oven plug wired in a ready, refrigerator delivered, but will not stay there long

Still left to do:
  • Tear out the built in workbench and the board behind it...after moving everything on it outside.
  • Tear down the loft - different plans for the bed area now but the top part of the loft might be reused for shelving along the back wall.
  • Sand down, seal and re-finish the floor. Decided to go with natural color instead of the dirty blue it currently is.
  • Insulation and dry wall
  • Install counters and sink

Insulation and dry wall hanging is this weekend!